Over the past several months, Whistler’s construction team has been busy!
Today, we’ll be providing updates on:
- Exterior
- Units
- Amenities
Exterior
As of June 2023, we’re proud to report that exterior finishes are complete!

Whistler exterior as of April 2023.
Units
Inside the building, unit finishes have already started on all levels, and furniture install is underway!
Unit kitchens are nearing completion, including lighting, white quartz countertops, matte black fixtures, and stainless-steel appliances. Check out our kitchen rendering versus the kitchen in The Cabell.

Representative rendering of Whistler kitchens.

Kitchen in The Cabell 4×4 as of April 2023.
In the bathrooms, shower tile and fixtures are in place.

Whistler’s showers feature beautiful tile and matte black fixtures.
To make sure every detail is accounted for, our construction team has conducted punch walks on all units. Punch walks are detailed inspections that are performed prior to a final walkthrough of the building.
All units and ground floor amenities have been punched, and the pool deck punch is underway.
Unit Walkthroughs
Check out the progress on our units by watching our walkthroughs below!
The Michel
View this post on Instagram
The Clement
View this post on Instagram
Want to see more unit walkthroughs? Check out our unit tours highlight on Instagram!
Amenities
The final paint has been applied to level one amenities, including the lobby, Daydreamer and the leasing office. Plus, the main light fixture has been installed in the lobby and the gorgeous railing on the main stair to the study mezzanine is in place.


The Whistler mezzanine and first floor are nearing completion, with finishes in progress.
On the study floor, fixtures are being placed and wallpaper is up. Check out the light fixtures, wallpaper and flooring in our rendering versus the Whistler fitness center:

Rendering of the Whistler study floor.

Whistler study floor as of May 2023, with light fixtures and wallpaper in place.
Check out the views from the Whistler study floor:

Floor-to-ceiling windows at the Whistler study floor bring in an abundance natural light.
In the fitness center, fixtures are already being placed. Check out the lighting fixtures in our rendering versus the Whistler fitness center:

Rendering of the Whistler fitness center, featuring unique lighting fixtures as seen in the top right.

Lighting in the Whistler fitness center as of April 2023.
In addition to unit punch walks, all amenity areas will undergo punch walks in May 2023, which means we’re getting closer and closer to opening our doors. This attention to detail ensures that every corner of the complex is polished and ready for move-in.

Views from the sauna at Whistler.
With amenities like a state-of-the-art fitness center, study lounges, and a rooftop infinity pool with stunning views of Midtown, we’re so excited to show our residents what Whistler has to offer.
We are on track for an on-time delivery and excited to continue to show you updates as we finish out these spaces. And remember, we’re so confident that Whistler will deliver on time, we guarantee it.
We hope you enjoyed this construction update, and we can’t wait to welcome all of our residents in August. Stay tuned for more updates! If you have any questions, contact our leasing staff – we are happy to help you in your search for housing.